datetime_now =2024-11-24T16:38:20
datetime_class =2024-11-29T00:00:00
datetime_diff =102816000
MBB Consulting™ - Design for Assembly (DFA) Training In Columbus, OH

Design for Assembly (DFA) Training In Columbus, OH

Design for Assembly (DFA) Training
Columbus is Ohio's capital and most populous city. DFA training helps Columbus students minimize total cost designing-in manufacturability.
Price $349 / student
Duration 1 day
Format In-person, instructor-led slideshow with exercises and a quiz to test comprehension.
Materials Each student will receive a 3-ring binder containing print-outs of the slideshow. Assuming satisfactory quiz results graded a few days after class, each student will receive a Certificate of Completion.
Class Size5 - 8 students
Start Day
SUMOTUWETHFRSA
Legend:
unavailable
available
facility match
CityColumbus, OH

Recommended Dates

The following dates are recommended because they have a low minimum student requirement, or students are enrolled but not yet enough to hold a class. Please choose a date for your Design for Assembly (DFA) Training class. Dates are formatted as year-month-day:


All Dates

If none of the recommended dates work with your schedule, that's ok. Please choose a date from the list below:



About Design for Assembly (DFA) Training


Who is Design for Assembly (DFA) Training for?

Design for Assembly is usually used by Product Design and Development Engineers. Manufacturing, Production, and Quality Engineers; and Procurement professionals must also know DFA to effectively participate in design reviews and assess and challenge the use of DFA or lack thereof. Managers of these functions should understand the terminology and concepts. If you are in or want to be in one of those roles, then DFA Training is for you. In our course, Columbus students learn:

Design for Assembly (DFA) Training Course Overview:

DFA training describes Design for Assembly - how Columbus students can minimize total cost through ease of manufacturing and assembling their designs. Total cost means across the entire company or enterprise; not just total material cost or departmental cost of the Product Design team. Designers must consider implications of capital investment needed for production equipment, utilities, production labor, inspection labor, warranty, etc. Usually, theses costs can be reduced through product simplification, especially those requiring less parts. Students will see how to assess assembly methods, choose one, then quantify the assembly efficiency of their designs using the chosen assembly method.

Columbus

Arch City

Excellent choice! Connection of the National Road from Baltimore linked Columbus to the Ohio and Erie Canal facilitating a population boom. German immigrants constructed breweries. Columbus and Xenia Railroads were built and expanded. Ohio's Statehouse was completed. WWII demand attracted Appalachian migrants. Downtown was revitalized with high-rises and a convention center. Meanwhile, Columbus developed several entertainment options for enjoyment after Design for Assembly (DFA) Training being home to many parks, festivals, landmarks, and museums, plus a zoo and aquarium. Perhaps the most popular of these is the Franklin Park Conservatory and Botanical Gardens.

Columbus
SUMOTUWETHFRSA
Columbus, OH
Credit: Derek Jensen

Facility

Columbus Design for Assembly (DFA) Training is delivered in our PNC Plaza facility located just off Broad Street near the Scioto River, downtown YMCA, Gavel Sculpture, Supreme Court of Ohio, and Ohio Statehouse.

Testimonials

Read what our students and clients have to say.

Brent H.
Brent H.
Design Engineer
Medical


Our GD&T class was a great experience!



David Oelrich
David Oelrich
HR Manager
Energy


I had the pleasure of working with our Master Black Belt in a high-tech manufacturing company where formal continuous improvement was a new concept. I was impressed with his ability to translate the concepts and skills needed to start down the path of the discipline in a way that was not only accessible to the employees, but excited them and moved many of them into being active, positive participants. I saw an immediate improvement in overall engagement, which helped in areas well beyond the tactical and functional areas included in the improvement project, itself.