datetime_now =2024-11-24T15:42:15
datetime_class =2024-11-29T00:00:00
datetime_diff =102816000
MBB Consulting™ - Lean Lego Game Training In Providence, RI

Lean Lego Game Training In Providence, RI

Lean Lego Game Training
Providence was at the forefront of the industrial revolution. Lean key Lean Manufacturing concepts in a playful setting building Lego houses.
Price $349 / student
Duration 1 day
Format In-person, instructor-led slideshow with exercises and a quiz to test comprehension.
Materials Each student will receive a 3-ring binder containing print-outs of the slideshow. Assuming satisfactory quiz results graded a few days after class, each student will receive a Certificate of Completion.
Class Size6 - 14 students
Start Day
SUMOTUWETHFRSA
Legend:
unavailable
available
facility match
CityProvidence, RI

Recommended Dates

The following dates are recommended because they have a low minimum student requirement, or students are enrolled but not yet enough to hold a class. Please choose a date for your Lean Lego Game Training class. Dates are formatted as year-month-day:


All Dates

If none of the recommended dates work with your schedule, that's ok. Please choose a date from the list below:



About Lean Lego Game Training


Who is Lean Lego Game Training for?

Since we all deal with and use processes in some form both at work and home, Lean Manufacturing training is useful for everybody. Yet, its usually taken by Providence students working in manufacturing or service provision. In our course, Providence students learn:

Lean Lego Game Training Course Overview:

Rather than death by PowerPoint, experience waste, push vs. pull processes, kanban, kaizen, systems thinking, and work cells in a fun exercise. This workshop is intended for students fairly early in their Lean journey but can be a fun refresher for more advanced practitioners. It can be run in either a short or longer session which never goes past half-day. A typical day looks like this:

IterationDescriptionDuration (min)
Introduction20
1Build Houses using a push system10
Retrospective focused on families of waste, push vs. pull, and kanban20
2Build Houses10
Retrospective focused on level-loading, systems thinking, and work cells20
3Build Houses10
Retrospective focused on kaizen20
4Build Houses10
Retrospective20
Conclusion20
Total160


A short session uses three iterations. A longer session uses all four.

Prerequisites. None

Providence

Renaissance City - What Cheer?

Excellent choice! Providence is the capital and most populous city of Rhode Island. Through its evolution, the city has been noted for textile manufacturing, machine tool, steam engines, jewelry, silverware industries, donuts, and chefs.

Providence
SUMOTUWETHFRSA
Providence, RI
Credit: Kenneth C. Zirkel

Facility

Providence Lean Lego Game Training is delivered next to the Superman Building a few hundred feet from Providence River.

Testimonials

Read what our students and clients have to say.

Jose G.
Jose G.
HVAC / I&E Technician
Chemical Manufacturing


This 5S training really opened my eyes when it comes to having the tools needed to efficiently perform my job.



Byungjoo K.
Byungjoo K.
Product Design Engineer
Automotive


From zero knowledge about auditing, IATF 16949 or ISO 9001, I now have fundamental knowledge about them and will be able to support for internal auditing. Our MBBC instructor was very well experienced.