datetime_now =2024-05-05T15:26:36
datetime_class =2024-05-17T00:00:00
datetime_diff =85881600
MBB Consulting™ - Design for Assembly (DFA) Training In Sacramento, CA

Design for Assembly (DFA) Training In Sacramento, CA

Design for Assembly (DFA) Training
Sacramento is the Capital of California. DFA training helps Sacramento students minimize total cost designing-in manufacturability.
Price $349
Duration 1 day
Format In-person, instructor-led slideshow with exercises and a quiz to test comprehension.
Materials Each student will receive a 3-ring binder containing print-outs of the slideshow. Assuming satisfactory quiz results graded a few days after class, each student will receive a Certificate of Completion.
Class Size5 - 6 students
Start Day
SUMOTUWETHFRSA
Legend:
unavailable
available
facility match
CitySacramento, CA

Recommended Dates

The following dates are recommended because they have a low minimum student requirement, or students are enrolled but not yet enough to hold a class. Please choose a date for your Design for Assembly (DFA) Training class. Dates are formatted as year-month-day:


All Dates

If none of the recommended dates work with your schedule, that's ok. Please choose a date from the list below:



About Design for Assembly (DFA) Training


Who is Design for Assembly (DFA) Training for?

Design for Assembly is usually used by Product Design and Development Engineers. Manufacturing, Production, and Quality Engineers; and Procurement professionals must also know DFA to effectively participate in design reviews and assess and challenge the use of DFA or lack thereof. Managers of these functions should understand the terminology and concepts. If you are in or want to be in one of those roles, then DFA Training is for you. In our course, Sacramento students learn:

Design for Assembly (DFA) Training Course Overview:

DFA training describes Design for Assembly - how Sacramento students can minimize total cost through ease of manufacturing and assembling their designs. Total cost means across the entire company or enterprise; not just total material cost or departmental cost of the Product Design team. Designers must consider implications of capital investment needed for production equipment, utilities, production labor, inspection labor, warranty, etc. Usually, theses costs can be reduced through product simplification, especially those requiring less parts. Students will see how to assess assembly methods, choose one, then quantify the assembly efficiency of their designs using the chosen assembly method.

Sacramento

City of Trees - Farm-to-Fork Capital

Excellent choice! Sacramento is a major producer of almonds, has great burgers, receives minimal snow, and is 2 hours from Lake Tahoe. The city lies at the confluence of the Sacramento and American Rivers. The district of Old Sacramento harkens back to the city's Gold Rush era, with wooden sidewalks and wagon rides. As a result of the Gold Rush, Sacramento became a major commercial center and distribution point for Northern California. Since then, it remains in growth mode with developing financial, educational, and medical resources.

Sacramento
SUMOTUWETHFRSA
Sacramento, CA
Credit: Sacramento Super Fan

Facility

Sacramento Design for Assembly (DFA) Training is delivered in our Elk Grove facility 14 miles southeast of Sacramento at the intersection of Golden State Highway and Bond Rd.

Testimonials

Read what our students and clients have to say.

Mason B.
Mason B.
Process Engineer
Paper


Our SMED instructor did a great job engaging the class with great work examples. From this class, other students agreed that the examples and pace were good, it was a nice overview of SMED / Lean process leading to great discussion, and that the knowledgeable instructor did a great job teaching and keeping it fun.



Kenton D.
Kenton D.
Director of Technical Services
Food Production


Instructor was very knowledgeable and presented (5S) material in a manner that held the interest of the class.